
Wiring Loom to suit G2-400D Winch
Wiring Looms are custom made for each individual boat using only premium Tycab Cable.
Each
custom loom will require four measurements. Please place the wiring
loom order with your retailer either upon purchase or after
installation. See below for the required measurements.
We only use quality tinned lugs and dual wall epoxy filled heatshrink. Prices are per loom, not per length.
Loom Mesurements
1. Battery to Switch Panel
Switch Panel mounting area of 100 x 100mm. This should be located to the left or above the steering position.
2. Battery to Solenoid
Solenoid can be mounted in a dry place anywhere between the Switch Panel and winch motor. Size is appr. 110x60x110. There will be four cables attached to the top.Under the dash or near winch motor is ideal.
3. Switch Panel to Solenoid
4. Solenoid to Winch Motor
Supplied instillation instructions feature a Switch Panel Template for easy installation.
Please note: There will be a 5% surcharge for all payment via PayPal for any Lone Star Products.
Payments via Credit Cards (Not through PayPal) and Bank Deposit. will incur NO surcharge fee's
This product was added to our catalog on Friday 04 May, 2012.